Keller ISD charged us with developing a world-class 50-meter pool for the district’s rapidly growing population. This massive space also had to seamlessly fit into a Town Center development upholding rigid traditional design guidelines. The result is an award-winning facility that was included as a training venue as part of the Dallas 2012 Olympic bid.
Components include: Seating for 600+, warm-up lanes, 2 movable bulkheads, diving, meet room & administrative spaces. Separate locker rooms for 4 high schools share common fixture spaces.